Safety decking for commercial construction
Safety decking for principal contractors and commercial construction. Trad Deck and G-Deck Lite assessed from drawings, with site surveys available where needed.

- 1996Original safety decking
- Class 3BS EN 12811-1:2003
- SSIPFASET & SMAS accredited
- 48 hrQuote turnaround
What principal contractors and concrete frame specialists care about
A survey that engages with the geometry. On a commercial floor plate the interesting question is not "how many panels do we need" — it is "how do we deck a bay with a 4.2m clear span, a structural penetration in the middle, and a set-down level either side". We answer that question on the survey, in front of the drawing, with the site manager present.
A system recommendation that is not a sales pitch. Trad Deck is familiar, light and absorbs low-level impact. G-Deck Lite offers steel rigidity with lightweight, low-profile components built for fast handling. Both carry a published 2.0 kN/m² UDL. Neither is automatically the right answer.
Technical documentation that holds up to a Cat-A design-team review. Spec sheets that reference the TRAD Safety Deck user guide, the Decking Loadings Chart, and the applicable standards by number and year. Method statements that ties into CDM 2015 and the Work at Height Regulations 2005 without hand-waving.
A crew that can mobilise nationwide on a tight window. Commercial programmes slip sideways more often than housing programmes do, and the deck install is usually one of the trades that has to absorb the slip. We plan for that.

How a commercial install works with us

- 01
Drawings and project enquiry
Send the floor plan, area, programme and access details. We measure on paper first and arrange an on-site walk only where the geometry or levels need checking.
- 02
System recommendation per area
Commercial floor plates can use Trad Deck, G-Deck Lite, or both. We assess handling, access, programme and the required platform arrangement rather than giving the whole floor one label by default.
- 03
RAMS that hold up to a design-team review
Method statement, risk assessment, competent-persons schedule, inspection regime, dismantle plan — all referenced against the source standards by number and year.
- 04
Install sequenced around your frame or fit-out programme
Our crew works around concrete pours, steel picks and fit-out trades rather than expecting them to work around us.
- 05
Documented inspections for long-duration installs
Daily visual inspection plus a documented weekly inspection under WAHR 2005, and a new Handover Certificate after any alteration, impact or adverse weather event.
The system-agnostic argument, in one paragraph
Trad Deck is a fall-prevention platform, and its polypropylene panels absorb low-level impact in a way a steel deck does not. G-Deck Lite is also a 2.0 kN/m² system, but its case is lightweight steel handling, rigidity and fast installation across suitable areas. We compare the real layout and programme, then document the chosen system in the RAMS and Handover Certificate.

Compliance, in the language your principal designer will want
Every deck we install on a commercial project is Load Class 3 under BS EN 12811-1:2003 on Trad Deck runs, with a safe working load of 2.0 kN/m² UDL (inclusive of operatives on the deck) and Class B material fragility under ACR[M]001:2014. Every platform over 2m is inspected and recorded under the Work at Height Regulations 2005. A jointly countersigned Handover Certificate is issued on install and after any alteration, impact, adverse weather event or reported incident. Every operative is CSCS-certified and every install is FASET-compliant. The full Trad Deck user guide, the Decking Loadings Chart and the TRAD Do's & Don'ts poster are available on request and will land with the RAMS pack after the survey.
Who you will be dealing with
Commercial surveys are almost always Paul Darrington or Ewan Craig on site in person — these are the jobs where the per-bay system recommendation has to be made by someone who has been making that recommendation for 30 years. The install itself is run by one of our senior installers, and Paul or Ewan will be back out for the handover walk-through.
Nationwide from St Neots. Core regions: Cambridgeshire, Bedfordshire, Hertfordshire, Northamptonshire, Buckinghamshire, East Anglia and the Midlands — with commercial jobs happening routinely well beyond them.

Keep reading
Trad Deck installation
Trad Deck fall-prevention platform quoted and installed by Graceland. Load Class 3 to BS EN 12811-1:2003. SWL 2.0kN/m² UDL. Class B material fragility.
Systems / Trad deckG-Deck Lite installation
G-Deck Lite steel safety decking, installed nationwide from Graceland depots in Cambridgeshire and Derby. Lightweight, fast and rated to 2.0 kN/m².
Systems / G deckSite survey
Safety decking site surveys where needed. Send Graceland your drawings and project details first; most jobs can be assessed and quoted without a visit.
Services / Site survey