Trad Deck installation

Trad Deck fall-prevention platform quoted and installed by Graceland. Load Class 3 to BS EN 12811-1:2003. SWL 2.0kN/m² UDL. Class B material fragility.

Trad Deck laid across a large floor plate, blockwork walls dividing the rooms
  • 2.0 kN/m² UDL
    Safe working load
  • Class 3
    To BS EN 12811-1:2003
  • Class B
    Material fragility
  • 1×1m / 1×0.75m / 1×0.5m
    Panel sizes

The safety decking system we install most

Trad Deck is the yellow interlocking plastic platform you'll see on most of our sites: hand-carried into a first-floor opening, assembled by a small crew, rated to real working loads, and dismantled once the trades above are finished. It is a fall-prevention platform — not a crash deck. The TRAD Safety Deck user guide is explicit on that point, and so are we. The system is designed to prevent a fall happening in the first place, not to arrest one.

We survey it, supply it, install it and dismantle it. A Graceland crew lays up to 300m² of deck a day, which is the number to plan your programme around.

The safety decking system we install most — Graceland safety decking
02Specification

What you get on site

A Trad Deck platform gives the trades above a lightweight working floor and turns a first-floor opening into a safe, managed working area. No nets to tension. No birdcage scaffold to book.

Every spec above is verified against the TRAD Safety Deck User Guide v2 2023, the Decking Loadings Chart and the TRAD Do's & Don'ts poster. Panels can be swapped mid-run to accommodate stair voids, service risers and non-square bays.

Specification
9 rows
panels
1×1m / 1×0.75m / 1×0.5m
platform heights
1.8m / 2.0m overall
swl
2.0 kN/m² UDL (202.66 kg/m²) — includes operatives on the deck
load class
3 under BS EN 12811-1:2003
material fragility
Class B under ACR[M]001:2014
safety factor
3 for small dynamic loads
min crew
2 trained and competent operatives (occasionally 3)
install rate
up to 300m² per day
max impact height
500mm — constant impact above this weakens panels
03Process

How a Trad Deck installation works

How a Trad Deck installation works — Graceland on site
  1. 01

    Enquiry

    Send us the drawings, site details and programme. We can usually measure and quote from that; if anything needs checking in person, we will arrange a survey.

  2. 02

    Plan and RAMS

    You get a method statement, risk assessment and delivery window before we book a crew.

  3. 03

    Install

    A two- or three-person crew lays the deck in one visit. Access is from the first-floor opening — no additional scaffold required in most layouts.

  4. 04

    Dismantle

    When the trades above are done, we collect and remove the deck in a single visit.

04Where this fits

Who we install it for

Housebuilders use Trad Deck as a standard site item on four-bed and five-bed plots, on care-home blocks and on apartment developments with repeatable floorplates. Concrete frame contractors use it as a catchment platform during slab pours. Commercial refurbishment specialists use it to work safely under existing roofs.

05The decision

Trad Deck vs G-Deck

Plastic (Trad Deck) is familiar, quick to pattern and has shock-absorption properties the user guide attributes to the plastic compound itself: if someone does fall onto it, serious harm is less likely than on a steel deck. G-Deck Lite is a lightweight steel alternative built for fast handling, rigidity and efficient coverage of suitable areas. Both are rated to 2.0 kN/m² UDL. We install both — see G-Deck Lite for the comparison.

Plastic flexes and absorbs. Steel does not. On most housebuilding sites, that is why we specify Trad Deck.
06Compliance

Loadings and compliance

If your H&S team needs the full documentation, the key Trad Deck downloads are available below and can also be included with your project pack.

  • Safe working load: 2.0 kN/m² UDL (includes operatives on the deck)
  • Load Class: 3 under BS EN 12811-1:2003
  • Material fragility: Class B under ACR[M]001:2014
  • Safety factor: 3 for small dynamic loads
  • Platform inspection: every deck over 2m must be inspected and recorded under the Work at Height Regulations 2005; a jointly signed Handover Certificate is issued after install and after any alteration
  • Standards: Work at Height Regulations 2005, CDM 2015
  • Crew: FASET members, CSCS-certified operatives
Quote within 48 hours · Talk to Paul or Ewan

Bring us in early — most jobs can be quoted from your drawings.